Infrastructure Projects International
![BHTT.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/d1f23622c90846c6898022aaee3f5ae8/1/4SoifmQpDrHbZJ6Vye3at/BHTT.jpg)
Project: Transmission Towers
Location: Baiji - Hadithat, Iraq
Description: 300km for the Ministry of Electricity.
![ULB1.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/fb2345e3a727419f88264cf9b9953e56/1/4SoifmQpDrHbZJ6Vye3at/ULB1.jpg)
Project: Umm Lafaina Bridge 1
- Location: UAE
- Description: 120m, Three equal 40m spans, Post tension concrete girders
![ULB3.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/e84a3f5219924f4d8f62bf9b82dfb71f/1/4SoifmQpDrHbZJ6Vye3at/ULB3.jpg)
![ULB2.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/ec709e9a15cb4670b74f981a0bd8d4a1/1/4SoifmQpDrHbZJ6Vye3at/ULB2.jpg)
Project: Umm Lafaina Bridge 2 and 3
- Location: UAE
- Description: Bridge 2: 25m single span, Bridge 3: 52m single span, Prestressed and post tension concrete girders
![SBUL3.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/a924046b667b46deb87eddac4ff3c9b8/1/4SoifmQpDrHbZJ6Vye3at/SBUL3.jpg)
![SBUL2.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/b6399a3051944ad493d28f80b562a422/1/4SoifmQpDrHbZJ6Vye3at/SBUL2.jpg)
![SBUL1.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/b3eb4c9cf82041e6b9c6910d1b471e73/1/4SoifmQpDrHbZJ6Vye3at/SBUL1.jpg)
Project: The Serpent
- Location: Connecting Abu Dahbi and Umm Lafaina Island
- Description: 5km Long
![SRBBC.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/a4a684dc98f54cd9bab5f0d13deff92d/1/4SoifmQpDrHbZJ6Vye3at/SRBBC.jpg)
Project: Skeena River
- Location: NW British Columbia, Canada
- Description: Design/Build 4 months, 852ft Span, Winner Consulting Engineers of B.C. Award Merit.
![LGBBC.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/bc3d94ea2c2a47c8b80432051380c74a/1/4SoifmQpDrHbZJ6Vye3at/LGBBC.jpg)
Project: Lions Gate
- Location: British Columbia, Canada
- Description: 1550ft Suspended span, Widening of 1937 structure to 3 standard width lanes.
![ACEMB.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/bb3f08ccacee43019e0a64970daeafb0/1/4SoifmQpDrHbZJ6Vye3at/ACEMB.jpg)
Project: Modular Buildings for Army Corps of Engineers
- Location: Baghdad, Iraq
- Description: Contractor village, 60 Buildings, Site work, Water and sewage, Pedestrian bridge.
![JCC.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/e8cb1009a95e4856941a2c320835d093/1/4SoifmQpDrHbZJ6Vye3at/JCC.jpg)
Project: Kings Al Hussein Bin Talal Convention Centre
- Location: Jordan
- Description: 261,000 Sqft., Design/Construction 7 months, Multi phase project.
![OCCS1.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/da2e29941cf3489d85c95f25ab9070ea/1/4SoifmQpDrHbZJ6Vye3at/OCCS1.jpg)
![OCCS2.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/b6299ed0d3a54d9eb1213e8a53ba478c/1/4SoifmQpDrHbZJ6Vye3at/OCCS2.jpg)
Project: Ottawa Civic Centre Stadium
- Location: Ottawa, Canada
- Description: 30,000 seat grand stand, Hockey arena/Convention center, 200 ft. cantilever.
![181457818_m_normal_none.jpg](https://static.gofasturtle.com/c07c8cdb92dd4dd18535e53a0a0f36f9/i/c716fa8fc0a444e382f984bc62b83103/1/GCuCv726gZycFxatRCb7iU/181457818_m_normal_none.jpg)